The new multiplex website indicates that the pool will be used for kayaking, but I was wondering if there has been any planning or communication with the city (or design team) on our use in the new pool. Specifically I was thinking equipment storage and polo pitch (nets and lines).
Has anyone given any thought as to how we will place the polo nets? Our current "pedestal" bases probably won't work as the new pool will be 54 m long (need 35m pitch). We could either go with floating or hanging nets. Floating nets are very bulky (heavy to move and large to store), hanging nets take a little more effort to set-up and require tie-points and anchors. I'm thinking we should ensure that these tie points are included in the construction phase of the new pool so we don't have to make modifications to the pool once it is up and running. I'll take some pictures of the hanging nets at Cup of the North, so we can review that option.
We will also need anchor points for the boundary lines (yeah we get boundary lines!!) to provide the 23 x 35 m pitch. Of course these should also line up with the goal placement.
If the club would like, I am willing to work with the city on this item if someone can forward me a contact. Or if someone is already working on this and wants a hand, let me know. If this is already all taken care of, then just disregard this post.
-NP